[Construction Case] Site-Poured Pile Extraction Work
Introducing a construction case using the all-casing method in a narrow work area!
We would like to introduce a case study of "bored pile extraction work" at Ebisu Kiko, which conducts various foundation and special construction work in civil engineering and architecture. 【Project Overview】 ■ Type of Work: Bored Pile Extraction Work ■ Site Address: Nakano-ku, Tokyo ■ Method: All-Casing Method ■ Extraction Details: Bored Pile φ700 L=11.2m 2 pieces ■ Machinery Used: RK Leaderless Pile Driving and Extraction Machine (Hydraulic Auger) 4.9tccHW (Counterweight Crane) / Wire Saw / Complete Plant ■ Backfill Material: Poorly Mixed After pile removal, a screw is inserted, and poorly mixed material is injected from the tip for replacement Stabilizing fluid is processed with a vacuum truck *For more details, please refer to the PDF document or feel free to contact us.